Xushui Industrial Zone, Zhengzhou City, Henan Province, China. +86-13838093345 info@kf-machinery.com

ball mill

ABOUT US Home > About Us

Engineer Commissioning


Ball mill installation:
A) installation plan is designed according to user's foundation, should in accordance with this direction, location and space for installation;
B) the fuselage below surface are on the ground steadfast, after levelness was adjusted, the level of material cylinder bottom plane is not larger than 1.5/1000;
1. installation
A) remove foreign bodies in the reserved hole in the installation equipment foundation, especially the inner wall of the hole can not have dust, oil, water and other liquids;
B) after take apart the packing cases, adopt appropriate lifting facility (crane/fork lift truck) remove the host to install location;
C) set the location equipment, anchor bolt in the installation hole, will randomly with "live" in anchor stud welding in the frame of the chassis, then only secondary grouting;
D) after installed 24 hours, tighten nut load commissioning;
E) plugged into power supply;
F) the installation check and correct discomfort;
G) electrical cabinets are placed in the auxiliary room, no installation.

ABOUT US

> About Us > Service

CONTACT US

Fill in this from or click the service online,all questions will be answered.